HollySys Paving the Way for Excellence in Railway Transportation

HollySys Paving the Way for Excellence in Railway Transportation

HollySys Paving the Way for Excellence in Railway Transportation

For the month of December 2019, HollySys has received two letters of commendation from Chengdu Rail Construction Management Co., Ltd. and China Railway Construction Kunlun Metro Investment Construction Management Co., Ltd. Both letters affirmed the working spirit and customer-centric attitude contributions of the Hollysys project team working on the Chengdu Metro Line 5. Concurrently, HollySys was rated as a top tier system integrator by Lanzhou Rail Transit Co., Ltd. for implementation of our Integrated Supervisory Control System for the Lanzhou Transit Line 1 https://hollysys.com.sg/lanzhou-rail-transit-line-1-launches-first-milestone-run/>

(Official Letter of Commendations (Source: HollySys Asia Pacific)

(Certificates of System Integrator Excellence (Source: HollySys Asia Pacific)

About Chengdu Metro Line 5

Chengdu Metro Line 5 has a span of 49.02 kilometers, with 41 stations, 2 parking lots, 1 depot and 1 control center. It is the longest one-time construction (4years) of Chengdu Rail Transit with the largest number of stations opening in the city rail transit history. Line 5 is part of the Chengdu metro network that is expected to carry 13.1 million passengers everyday by 2020.

HollySys Comprehensive Monitoring Systems

For the Chengdu Metro Line 5 project, Hollysys implemented our comprehensive monitoring systems, consisting of ISCS system, BAS system, FAS system, ACS system and PSCADA system. During the project implementation, our engineers worked round the clock to perform important tasks such as full-line interface debugging and full-function debugging with a professional and technical prowess.

Moving forward, HollySys will continue to adopt a “Customer First” attitude to support and ensure the lines are operated smoothly and efficiently.